Our Mission each day is to provide the best golf course possible to Members and their Guests. This blog shares information as to how we achieve that mission.
Wednesday, April 27, 2016
Aerification, In Motion
In my last post I explained how aerification works in text, in this post you will see the team in action. This video goes behind the scenes of Aerification week.
Thank you to John Shearer for making this video happen. Our plan is to make videos throughout the year to talk about other elements of golf course management.
Friday, April 22, 2016
How did you do that?
Five-Eleven (5:11PM) April twentieth. That is the time I took this picture and greens aerification was complete. Two days of team work, sweat, dust, and cooperation of Mother Nature produced a fantastic finished product. Its a sense of accomplishment to watch your team work together to complete the task you set in front of them. Its a week full of mixed feelings. You know its necessary and beneficial, but you also can't wait for it to be over. Frustrations can set in quickly if mother nature doesn't cooperate, but this year she has never been friendlier.
Eight steps, of equal importance, form the process for greens aerificaiton.
"Why is aerification necessary?" The following diagram answers that question better than any explanation on paper.
Turf needs oxygen, water, nutrients, and sunshine to survive. I rely on mother nature for sunshine. Nutrients I supply, as needed, to the soil through fertilization. Water and oxygen are needed in balance, I help get both into and out of the profile from aerification.
Step 1. - Deep-tine
Deep-tine aerification is apart of my program for healthy turf. Improved oxygen exchange and water infiltration deep into the profile provides a healthier environment for turf to grow. If both of these necessary inputs moving further into the profile the hope is the root of the plant also has a better environment to exist in. The depth achieved with these half-inch tines is 6+ inches.
Step 2 - Roll
Rolling after deep throat (the nickname for our deep-tine machine) smooths out any bumps and firms the surface slightly before topdressing.
Step 3 - Topdress
Dilution is the solution. Research has shown if sand is added to the profile (Profile is the medium in which the grass grows. That medium in most cases is sand) at an equal rate to thatch production organic matter percentages can be held at desired levels and there is no need to remove organic matter (pull a core) during aerification. Interesting to note I incorporate use sand doing aerification with this process. I believe this is due to the integrity of the hole remains making it easier to incorporate topdressing. (Topdressing is the same as sand.) The included soil sample report from nine green shows an organic matter percentage of 2.06%. The maintenance goal is a percentage of less than 2.3% Nine green will be tested again this Summer, as with many others, to determine if the same practice can be used for Fall Aerification or if changes must be made to this process and other maintenance practices throughout the year.
Step 4- Aerify, Again.
Yes, each green gets aerified twice. Before anything happens in this step the sand must be completely dry from step 4. Cooperation from Mother Nature makes this step a lot easier. The vibration of the machine and the small drag brush attached to the back, gets a majority of the topdressing incorporated into the holes.
Step 5 - Incorporation
As soon as a green is finished being aerified drag brushes are passed over the greens to incorporate topdressing that needs to cap off an open hole. Two different brushes, or varying texture and rigidity are used to incorporate the sand.
Step 6 - Roll
This step begins to put things back to normal. Each green will be rolled 3 times before we determine the process to be complete. Direction is also important. Each direction is different and also different to the direction of the aerifier. If a green is aerified at a direction of 6 to 12, no final rolling can be performed in that direction. Altering direction helps smooth humps and bumps created from the machinery that goes across the green to complete aerification.
Step 7 - Final Cleanup
A final visual inspection is performed to determine if more topdressing is necessary or extra needs to be removed. Brooms, shovels, and blowers are used as necessary.
Step 8 - Give it a Drink
After being aerified twice, trampled by numerous machines, and rolled four times, the turf final gets a drink of water.
In addition to this process, other crew members are working on aerifying and topdressing fairways and approaches. It is a great feeling leaving work today with all of our goals accomplished. In the field of Golf Course Management that doesn't seem to happen very often. I'm extremely proud of my crew this week. Their teamwork and positives attitudes made the week a success.
A combination of rain and sun in the near future and the course will heal in as we desire and the benefits of aerification will be in the profile.
Eight steps, of equal importance, form the process for greens aerificaiton.
"Why is aerification necessary?" The following diagram answers that question better than any explanation on paper.
Turf needs oxygen, water, nutrients, and sunshine to survive. I rely on mother nature for sunshine. Nutrients I supply, as needed, to the soil through fertilization. Water and oxygen are needed in balance, I help get both into and out of the profile from aerification.
Step 1. - Deep-tine
Step 2 - Roll
Rolling after deep throat (the nickname for our deep-tine machine) smooths out any bumps and firms the surface slightly before topdressing.
Step 3 - Topdress
Dilution is the solution. Research has shown if sand is added to the profile (Profile is the medium in which the grass grows. That medium in most cases is sand) at an equal rate to thatch production organic matter percentages can be held at desired levels and there is no need to remove organic matter (pull a core) during aerification. Interesting to note I incorporate use sand doing aerification with this process. I believe this is due to the integrity of the hole remains making it easier to incorporate topdressing. (Topdressing is the same as sand.) The included soil sample report from nine green shows an organic matter percentage of 2.06%. The maintenance goal is a percentage of less than 2.3% Nine green will be tested again this Summer, as with many others, to determine if the same practice can be used for Fall Aerification or if changes must be made to this process and other maintenance practices throughout the year.
Step 4- Aerify, Again.
Yes, each green gets aerified twice. Before anything happens in this step the sand must be completely dry from step 4. Cooperation from Mother Nature makes this step a lot easier. The vibration of the machine and the small drag brush attached to the back, gets a majority of the topdressing incorporated into the holes.
Step 5 - Incorporation
As soon as a green is finished being aerified drag brushes are passed over the greens to incorporate topdressing that needs to cap off an open hole. Two different brushes, or varying texture and rigidity are used to incorporate the sand.
Step 6 - Roll
This step begins to put things back to normal. Each green will be rolled 3 times before we determine the process to be complete. Direction is also important. Each direction is different and also different to the direction of the aerifier. If a green is aerified at a direction of 6 to 12, no final rolling can be performed in that direction. Altering direction helps smooth humps and bumps created from the machinery that goes across the green to complete aerification.
Step 7 - Final Cleanup
A final visual inspection is performed to determine if more topdressing is necessary or extra needs to be removed. Brooms, shovels, and blowers are used as necessary.
Step 8 - Give it a Drink
After being aerified twice, trampled by numerous machines, and rolled four times, the turf final gets a drink of water.
In addition to this process, other crew members are working on aerifying and topdressing fairways and approaches. It is a great feeling leaving work today with all of our goals accomplished. In the field of Golf Course Management that doesn't seem to happen very often. I'm extremely proud of my crew this week. Their teamwork and positives attitudes made the week a success.
A combination of rain and sun in the near future and the course will heal in as we desire and the benefits of aerification will be in the profile.
Saturday, March 19, 2016
What do you do all winter?
"What do you do all winter?" Is a question often asked of me when people find out what I do for a living. Some are curious, others think the golf course is closed and I get the whole winter off.
Winter is probably the hardest season to work through. The weather is hard on crew moral and they dig dip to keep pushing forward. You never know what the day is going to bring, we must be willing to change course at the mercy of Mother Nature.
So what did we do all winter? As we make a push to complete all of our winter projects before the calendar turns to aerification, I want to reflect on what we accomplished.
Six additional mats were added to the turf strip at the driving range The popularity of these mats showed a need to add more space. Limited space due to underground irrigation pipe, made six a perfect fit. With 16 total mats available 4 groups can warm up before making their way to the first tee.
Before the mats can be added, the subgrade must be installed. A four inch thick slab of concrete is poured on top of a 6 inch thick bed of gravel to provide a stable base.
The mat system is very similar to a floating floor. A plastic frame snaps together and is anchored to the concrete at proper dimensions to provide the border that the mats sit within. Setting the first corner is the most important step in getting the border correct.
Winter is probably the hardest season to work through. The weather is hard on crew moral and they dig dip to keep pushing forward. You never know what the day is going to bring, we must be willing to change course at the mercy of Mother Nature.
So what did we do all winter? As we make a push to complete all of our winter projects before the calendar turns to aerification, I want to reflect on what we accomplished.
Six additional mats were added to the turf strip at the driving range The popularity of these mats showed a need to add more space. Limited space due to underground irrigation pipe, made six a perfect fit. With 16 total mats available 4 groups can warm up before making their way to the first tee.
Before the mats can be added, the subgrade must be installed. A four inch thick slab of concrete is poured on top of a 6 inch thick bed of gravel to provide a stable base.
The mat system is very similar to a floating floor. A plastic frame snaps together and is anchored to the concrete at proper dimensions to provide the border that the mats sit within. Setting the first corner is the most important step in getting the border correct.
Once the border is set, the crew gets to work making it fit into the space. The tedious task of setting and leveling every brick shows the crews attention to detail.
As always the staff did a great job working together to produce a great finished product.
Tree removal continued to be a point of emphasis this winter. The picture below was posted to twitter last fall by a fellow Superintendent, showing the affect of trees on a plants inability to grow to its full potential in a less than ideal environment.
If a tree can have this much affect on a corn plant that grows to over eight feet tall, imagine its affect on a plant maintained at less than one half of an inch? (Greens are mowed at .140" and tees at .325")
Trees do have their place in golf, but a balance has to be made between their necessity and impact on turf quality and expectations.
This picture is beautiful in so many ways, the sun, the shadows, the clouds, and contrasting light and dark. From a turf managers perspective those dark spots are troubling for the overall health of the sixth green.
Trees were removed to the right of the fifth green to increase the duration of morning sunlight.
The picture below is the fifth green from a different angle post tree removal. (It has been hard to get a picture with the green under full sun this winter.)
Other tree removal and cleanup is aesthetic. The area right of 17 green was cleaned out, opening a view to 16 fairway.
Safety is a reason to remove trees. A big leaf maple behind 10 green was removed due to a large crack that had developed in the trunk. Luckily this was discovered and before anyone or anything was damaged.
Wet areas throughout the course were identified and the issue were addressed when possible. This area on the right side of the fourth fairway had an excessive thatch layer preventing proper water infiltration.
The first step is removing the sod, opening up the layer of thatch that is causing the problem. The layer is removed and replaced with sand to help water, nutrient, and oxygen exchange into the profile.
The soil below this layer is usually dry. The small pores of the thatch layer limit water movement into the sand below resulting in excessive surface moisture.
We have seen better results (almost instantly) from removing the thatch layer than by adding additional drainage to the existing subsurface drainage.
Improving cart drive-on areas has also been a point of emphasis with the same strategy. Decreasing the time it takes these areas to dry down, increases the number of days cart can be on course and also improve the turves ability to withstand cart traffic.
The color of the clay indicates it holds water more than half the year, known as gleying. Gleying is the saturation of the soil profile where water replaces air in available pore space. An increase in water, limits drainage resulting in an anerobic (lack of oxygen) environment which is a poor environment to grow grass.
We recently completed a renovation of the bunkers on #17. This has been a project each winter to improve the aesthetic appeal of the bunkers throughout the course.
The crew did a great job of getting this project completed and we are really happy with the finished product.
I am excited for what 2016 has in store. The crew has worked extremely hard, through record rain, improving areas throughout the course in preparation for summer. I believe this hard work and dedication will pay off for the upcoming season.
Monday, February 15, 2016
History of Aldarra Farms
I am excited to publish the information below. I do not believe some of this information has ever been released publically in a digital form. The History of Aldarra Farms has always intrigued me. This post gives all that I know, as told by Bud Abbott. Mr. David 'Bud' Abbott was the care taker of the farm at the times of its sale to be converted into the amazing golf course we know it as today. Those eighteen holes are spread out over very interesting history. Enjoy!
Written by Bud Abbott, Aldarra Farm Manager.
Transcribed to Microsoft word by Mike Swingle
To do a history of Aldarra Farms, one should go back to the 1850’s.

In this year of 1915, J.F.
Duthie, a ship builder in Seattle, bought the lands held by J. Bailey, D
Carmichael, Duelly and Harry Moore. By
the year 1917 he had purchased a total of 525 acres. It was said that by the end of World War I,
Duthie had 150 men working on the farm.
Duthie had named his farm ‘Walldale Farm’ and developed a showplace as a
producing farm plus a recreation center.
There was tennis, golf, fishing and skating to keep people
entertained. The generating plant using
the flow of Canyon Creek made the farm look like Electric City. In 1930 Duthie passed Walldale Farm on to J.
W. Bullock and C.E. Crandell.
The main road through the
barnyard at Aldarra was once a dead-ending county road, but in November, 1943
Mr. Boeing, having then purchased the 200-acre Foster-Swalwell Farm to the east
of the Main barns, got a closure on this part of 292nd Ave SE. In 1963, King County did some straightening
of the Duthie Hill Road and rebuilt the bridge crossing Patterson Creek.
Written by Bud Abbott, Aldarra Farm Manager.
Transcribed to Microsoft word by Mike Swingle
To do a history of Aldarra Farms, one should go back to the 1850’s.
Native Americans occupied the
Fall City area. The only longhouses were
in Fall City and Tolt, with their locations near today’s school houses.

This entire area was heavily
forested and was opened up by the Homestead Law of 1882, which provided for the
disposition of public lands to homemakers free of charge, requiring only
residence, cultivation, and improvement.
A person who was the head of a family or who had reached the age of 21
and was a citizen of the United States could apply for 80 acres. A Civil War veteran was entitled to 160
acres. Upon residing thereon,
cultivating and improving the same for three years in compliance with the law,
one would obtain ownership of his land.
In 1883, Bert Taylor homesteaded
the most eastern part of Aldarra’s River Farm.
Following west were homesteaders John Warren and Hans Moore, a
veteran. Continuing west were W.A.
Cruikshank, Victor Hanson, John T Stone, E.L. Tapert, and William Dudley. Swalwell, Bailey, and Carmichael were the
three homesteaders that farmed what is now the main farm at Aldarra.
The first logging was done along
the Snoqualmie River where the logs were branded and floated down river to
Everett. When they were sold was
sometimes a year later. Prices for the
logs at the time were as low as $4.50 per thousand.
There was a cedar shake mill on
Patterson Creek where Aldarra’s B and B Farm is today. A picture shows shake bolts being sledded
across Canyon Creek.
The use of the Washington Donkey
Engines made it possible to pile the stumps up high for burning, and most saw
logs were yarded and loaded with such machines.
The western acreage of the main farm was logged by railroad to the mill
at Monahan, which was a large sawmill on the east shore of Lake Sammamish. Two former rail ends can be seen at upper
elevations of the farm. The logs from
the lowlands were trucked to the Snoqualmie Falls Lumber Company which in 1914
became a Weyerhaeuser Mill. The aid of a
tractor was most often needed to get up the Falls hill. The size of the logs is apparent in some of
the photos.
In the early days of Fall City
there were two ways to get from Seattle to the Valley. One was by foot via Renton and Issaquah, a
two-day walk. The other choice was by
boat via Everett. The vessels were the
‘Traveler’ and the schooner ‘A.Y. Trask’.
These trips began in 1855 and by 1883 the vessel ‘Alki’ had a regular
run.
In 1889 the railroad reached Fall
City via Issaquah. This brought on a
boom to the area.
The first school was founded in
Fall City in 1879 and was the only one in our valley until the Patterson Creek
School was built in 1890. This school
was on the land that is now Aldarra’s B and B Farm. It was closed in favor of Fall City in 1915.
In this year of 1915, J.F.
Duthie, a ship builder in Seattle, bought the lands held by J. Bailey, D
Carmichael, Duelly and Harry Moore. By
the year 1917 he had purchased a total of 525 acres. It was said that by the end of World War I,
Duthie had 150 men working on the farm.
Duthie had named his farm ‘Walldale Farm’ and developed a showplace as a
producing farm plus a recreation center.
There was tennis, golf, fishing and skating to keep people
entertained. The generating plant using
the flow of Canyon Creek made the farm look like Electric City. In 1930 Duthie passed Walldale Farm on to J.
W. Bullock and C.E. Crandell.
Crandell built one building in
1932, a barn we now call the Homestead Barn.
Lumber from what was U.S. 10, today State Highway 202, was used to build
this barn.
In March 1942, William E. Boeing, Sr. took ownership of the
Walldale Farm from C.E. Crandell. There
was a total of 525 acres. On March 17,
1942, Dutch Abbott moved onto the property as the manager of the newly named
‘Aldarra Farms’. The name ‘Aldarra’ was
the name used by W.E. Boeing for his Seattle home. Mr. and Mrs. Boeing moved into the Duthie
house in late 1942 after some remodeling was completed.
Boeing’s plans for Aldarra Farms
were not just a comfortable home but to also improve the quality of livestock
in the Northwest and to introduce modern farming methods.
In April 1943, a foundation herd
of registered Guernsey Dairy Cattle was purchased from Western Glow Farms of
Bow, Washington. In this purchase of
twenty-nine pregnant cows was Martha of Aldarra who became National Butterfat
Champion on 1949.
In 1945, a foundation herd of
registered Horned Hereford Beef Cattle was purchased from the Wyoming Hereford
Ranch, which was owned by the Quaker Oats Company. These, some thirty cows and bulls, became the
top herd in this area. The farm was the
proud owner of prize winners in national cattle shows such as Chicago, Kansas
City, Ogden and San Francisco. They were also prize winners at our local
fairs in Western Washington and Portland, Oregon’s Pacific International. The number of cattle at the year 1955 was
over 500 head. From that time, the
numbers of cattle were reduced each year until August, 1993, when the last were
sold.
Registered Duroc-Jersey Hogs were
purchased in 1944 from three State Fair sales in the Midwest. These hogs multiplied into eighty head and,
because of a shortage of labor, were given to the University of Idaho in 1946.
A close friend of the Boeing’s
gave the farm two pregnant Columbia Ewes.
These sheep, being a breed developed for the climate of the Northwest,
also multiplied as an annual lamb crop can well be 150%. Two hundred were sold and shipped to eastern
Montana in 1950. Aldarra was one of the
founders of Puget Sound Wool Growers, which is a marketing co-op for our wool
from seven Western Washington counties.
Two teams of draft horses came to
the farm with Dutch, a great lover of horses.
These horses were used in moving and clipping the fields. They also helped in land clearing, where they
would pull a sled for rock and stick removal.
The last task for the draft horses was pulling a beer keg wagon in
downtown Seattle during SeaFair week.
Chickens and turkeys were also
raised in limited numbers on the farm.
These were used for domestic use only.
A large garden was maintained at the Duthie Home, and with the aid of a
greenhouse, vegetables were supplied to some of the households.
The milk from forty milk cows was
used at Aldarra to furnish the needs of each household. Separated cream was shipped to the Golden
Rule Bakery in Seattle. The skim milk
all went to the pigs.
The first plowing by Aldarra was
in the Fields NL-1 and SL-3. These
fields were planted with a hybrid corn for silage. This corn grew to thirteen
feet high and gave great tonnage per acre for silage.
Two attached silos on the Main
Barn were showing age to a point where they were replaced by two tile silos in
1947. By the year 1950, the corn silage
was replaced by grass silage. This was
done because of the volume need and the greater amount of labor required with
the corn. At this time, a glass lined
steel silo was also installed just west of the Main Barn, and it had a capacity
of 240 tons. The above mentioned second
tile silo was located at Feed Lot No 1.
In 1948, a Heil Hay Dehydrator
was purchased and placed on property that was purchased from Siler Logging Company
which was on the very southeast corner of Section 6 and the Duthie Hill Road. This machine enabled Aldarra to make hay from
April to October, even in the rain. A
high headed ride o 70 feet for the grass found It baled within three minutes. Using fuel oil costing five cents a gallon
and growing orchard grass resulted in a product with more nutrition than
alfalfa. The fast rising cost of fuel
and Mr. Boeing’s passing in 1956 brought on the sale of this equipment in the
next year.
Cereal grains were grown from
three years but only with success in the first year, 1949. The need of a full three-month growing season
ending with dry warm weather ended this program.
A labeling of Aldarra’s fields by
letter and number was most important for all phases of operations. One enclosed map shows Aldarra’s Township
location and a second map shows the field layout.
Water rights were a very
important part of the everyday operations with the farm. The first rights were
given in 1939 and were later transferred to Aldarra in 1946. The rights and their locations are on an
enclosed map. Most of Aldarra’s
irrigation began in 1939 by C.E. Crandell and was expanded in 1948 with the
irrigation of some 100 acres of grassland plus some 6 acres of gardens and
yards. The eight homes that remain today
on the farm were built over a span of 80 years.
Six older, or out of need, homes have been removed during Aldarra’s time
of ownership.
The main road through the
barnyard at Aldarra was once a dead-ending county road, but in November, 1943
Mr. Boeing, having then purchased the 200-acre Foster-Swalwell Farm to the east
of the Main barns, got a closure on this part of 292nd Ave SE. In 1963, King County did some straightening
of the Duthie Hill Road and rebuilt the bridge crossing Patterson Creek.
The last property that was
purchased for Aldarra was 21.35 acres in Section 12 to the west of P-1. Land clearing was a never ending program
going back to the Homesteading days and was just about ended in 1977.
Mr. William E Boeing Sr. passed
away on his yacht in 1956 and his widow, Bertha Boeing, passed away just twenty
years later at the farm she loved so well.
The ownership of Aldarra Farms was passed on to William E. Boeing Jr. in
1977, after his mother’s passing.
I, David ‘Bud’ Abbot, was made
the manager of Aldarra Farms on January 1, 1951 upon my father, Dutch Abbott’s
retirement. I have seen, been a part of, the past 50 years of Aldarra farms life. The picture at daybreak that I have enclosed
shows why one gets up in the morning.
Tuesday, February 2, 2016
Weather Station - KWAISSAQ71
You might have noticed something different driving up the entrance the last couple weeks. A weather station was added that provides real time information on weather underground. The station has to be within one hundred yards of a computer for it to wirelessly transmit information to a base station before being reported to the internet.
Search KWAISSAQ71 to find the correct station on wunderground.com. By just searching 'Aldarra Golf Club' you will be getting data from a different nearby station.
Frost delays will still happen, but now you can be in the loop from either your home or office before venturing out to the Club.
The station also benefits our turf operation. Accurate onsite information will improve proper timing of fungicides or plant growth regulators applications that benefit turf quality.
Search KWAISSAQ71 to find the correct station on wunderground.com. By just searching 'Aldarra Golf Club' you will be getting data from a different nearby station.
The station also benefits our turf operation. Accurate onsite information will improve proper timing of fungicides or plant growth regulators applications that benefit turf quality.
Friday, November 6, 2015
Where did all the stripes go?
I am often asked why we change our mowing pattern in the winter? The answer is two fold:
Time:
It is two hours faster, (one hour per mower) to mow block cut compared to stripes. The windows of opportunity to complete the necessary mowing are shorter in the winter due to the increased chance of rain. The shortened time needed to complete fairway mowing can be the difference in getting everything mowed in one day or having to wait a few days to finish.
Plant health:
Its not the health of the fairway grass (Annual bluegrass & Creeping bentgrass) I am concerned about, its the health of the rough. Mowing half & half reduces the amount of turns the operator makes in the rough. The largest amount of mechanical stress is placed on grass when a mower turns on it. The operator mows the fairway similar to that of a Zamboni machine preparing an ice rink. Limiting the number of turns in the rough directly surrounding the fairway gives the Perennial ryegrass a chance to maintain its density through the winter.
It is two hours faster, (one hour per mower) to mow block cut compared to stripes. The windows of opportunity to complete the necessary mowing are shorter in the winter due to the increased chance of rain. The shortened time needed to complete fairway mowing can be the difference in getting everything mowed in one day or having to wait a few days to finish.
Plant health:
Its not the health of the fairway grass (Annual bluegrass & Creeping bentgrass) I am concerned about, its the health of the rough. Mowing half & half reduces the amount of turns the operator makes in the rough. The largest amount of mechanical stress is placed on grass when a mower turns on it. The operator mows the fairway similar to that of a Zamboni machine preparing an ice rink. Limiting the number of turns in the rough directly surrounding the fairway gives the Perennial ryegrass a chance to maintain its density through the winter.
Wednesday, October 7, 2015
Going Farming, Again!
Welcome
to Aldarra Farms! Driving up the entrance
road you are promptly reminded the property was a farm before it was
a golf course.
![]() |
This sign found during construction hangs in the mechanics shop in the maintenance barn. |
My office is a converted bull pen. The slider door for the pen was restored and left during construction to maintain some of the original feel.
Robert
Izen asked me soon after his arrival as Food & Beverage Coordinator if it
would be possible to build an herb garden.
Connecting with the history of the property has always been in the back
of my mind, this was a chance to put it to work. My team and I decided to build something
slightly larger than just an herb garden.
We found space behind our main barn and turned Robert’s idea into
reality.
The garden measures 10 feet wide by 18 feet long. It is U-shaped with a walkway down the middle allowing access to each planter bed. Soil still needs to be added and chicken wire attached around the structure to keep the deer and other animals out. Seeds will be sown in the Spring of 2016 and farm fresh vegetables available for consumption shortly after. Lettuce, onions, peppers, tomatoes, corn, and a variety of herbs will provide a splash of freshness and a small connection to our history.
Subscribe to:
Posts (Atom)




































